{"id":8051,"date":"2025-08-28T21:23:52","date_gmt":"2025-08-28T21:23:52","guid":{"rendered":"https:\/\/princetonillinois.com\/?p=8051"},"modified":"2025-08-28T21:23:52","modified_gmt":"2025-08-28T21:23:52","slug":"princetons-historic-red-covered-bridge-enters-next-phase-of-repairs-shawlocal-com","status":"publish","type":"post","link":"https:\/\/princetonillinois.com\/?p=8051","title":{"rendered":"Princeton\u2019s historic Red Covered Bridge enters next phase of repairs &#8211; shawlocal.com"},"content":{"rendered":"<p><img data-recalc-dims=\"1\" decoding=\"async\" class=\"robot-feature-image\" src=\"https:\/\/i0.wp.com\/www.shawlocal.com\/resizer\/9TZVD666HNyfOH0WxBoxnCydTBw%3D\/1200x630\/filters%3Aformat%28jpg%29%3Aquality%2870%29\/cloudfront-us-east-1.images.arcpublishing.com\/shawmedia\/3NWB77NCRVBZXMTXHEUKNFYXIE.jpg?w=860&#038;ssl=1\" \/><br \/><span>An interior view of the Red Covered Bridge on Monday, June 30, 2025 in Princeton. Last Friday, the Illinois Department of Transportation announced that the historic bridge enters next rehabilitation phase. Phase II includes the preparation of a detailed cost estimate and expected to take 12 to 18 months to complete and will result in advertising a repair contract to bidders. Approximately $1 million is identified to pay for the needed repairs in IDOT\u2019s most recent\u00a0multiyear program. A view of the Red Covered Bridge on Monday, June 30, 2025 in Princeton. Last Friday, the Illinois Department of Transportation announced that the historic bridge enters next rehabilitation phase. Phase II includes the preparation of a detailed cost estimate and expected to take 12 to 18 months to complete and will result in advertising a repair contract to bidders. Approximately $1 million is identified to pay for the needed repairs in IDOT\u2019s most recent\u00a0multiyear program. The bridge survived a number of threats, both intentional and unintentional, including arson, erosion and high winds. It also has survived several strikes by large trucks with it&#8217;s most recent strike in 2023. <\/span>(Scott Anderson)<br \/><a href=\"https:\/\/www.shawlocal.com\/tags\/princeton\/\" target=\"_blank\" rel=\"\">Princeton<\/a>\u2019s historic <a href=\"https:\/\/www.shawlocal.com\/illinois-valley\/2024\/12\/02\/a-year-after-red-covered-bridge-in-princeton-awaits-plan-finalization-before-repairs-begin\/ \" target=\"_blank\" rel=\"\" title=\"https:\/\/www.shawlocal.com\/illinois-valley\/2024\/12\/02\/a-year-after-red-covered-bridge-in-princeton-awaits-plan-finalization-before-repairs-begin\/ \">Red Covered Bridge<\/a> has entered the next phase of rehabilitation after sustaining heavy damage when the driver of a semitractor-trailer tried to pass through it.<br \/>The bridge, an Illinois landmark, closed in <a href=\"https:\/\/www.shawlocal.com\/illinois-valley\/2023\/11\/16\/princetons-red-covered-bridge-heavily-damaged-by-semi-trailer\/ \" target=\"_blank\" rel=\"\" title=\"https:\/\/www.shawlocal.com\/illinois-valley\/2023\/11\/16\/princetons-red-covered-bridge-heavily-damaged-by-semi-trailer\/ \">November 2023<\/a>, following the accident that damaged sections of the bridge\u2019s fa\u00e7ade and roof, when the semi driver attempted to enter through the north end.<br \/>Princeton City Manager Theresa Wittenauer said in a news release that the city has received many inquiries about the status of the rebuild of the bridge and how to prevent this type of accident in the future.<br \/>The Illinois Department of Transportation said in a news release that IDOT\u2019s District 3, where the bridge is located, has worked behind the scenes to prepare for the structure\u2019s rehabilitation following a vehicle strike that left it severely damaged. <br \/>\u201cThe district has begun the first phase of engineering, also called Phase I, which will define the scope of work and a preliminary cost estimate,\u201d according to the news release. \u201cIDOT responded quickly by inspecting the structure and working to ensure the roof was temporarily supported until a permanent fix could be made, preventing additional, costly damage.\u201c<br \/>Other precautions were taken to prevent further damage to the 149-foot historic structure. In 2024, a structural engineering firm completed a thorough inspection and evaluation, which reviewed the entire structure for typical aging over time and included initial concepts of potential repair techniques, according to IDOT.<br \/>The consultant\u2019s findings have been documented in a Bridge Condition Report, which was reviewed and approved by IDOT this past January, according to the release.<br \/>In April, IDOT said it received concurrence from the State Historic Preservation Office that IDOT\u2019s preliminary repair plans will not adversely affect the historic nature of the bridge. <br \/>IDOT said the district is prepared to begin Phase II engineering as soon as Phase I design approval is received from the Region 2 engineer. <br \/>\u201cPhase II includes the preparation of a detailed cost estimate and is expected to take 12 to 18 months to complete and will result in advertising a repair contract to bidders,\u201d IDOT said. \u201cApproximately $1 million is identified to pay for the needed repairs in IDOT\u2019s most recent multiyear program<b>.<\/b><br \/>Wittenauer said the city is thrilled to hear about IDOT\u2019s recent plans moving forward, as well as funding being allocated for the rehabilitation of the historic Red Covered Bridge. <br \/>\u201cThis project represents not only a vital investment in local infrastructure but also a meaningful commitment to preserving a cherished piece of our community\u2019s heritage,\u201d she said. \u201cThe Red Covered Bridge is a beloved landmark and a key attraction that draws visitors to our area, supporting local tourism and businesses. We deeply appreciate IDOT\u2019s support in helping safeguard this iconic structure for generations to come.\u201d<br \/><span>A view of the Red Covered Bridge on Monday, June 30, 2025 in Princeton. Last Friday, the Illinois Department of Transportation announced that the historic bridge enters next rehabilitation phase. Phase II includes the preparation of a detailed cost estimate and expected to take 12 to 18 months to complete and will result in advertising a repair contract to bidders. Approximately $1 million is identified to pay for the needed repairs in IDOT\u2019s most recent\u00a0multiyear program. A view of the Red Covered Bridge on Monday, June 30, 2025 in Princeton. Last Friday, the Illinois Department of Transportation announced that the historic bridge enters next rehabilitation phase. Phase II includes the preparation of a detailed cost estimate and expected to take 12 to 18 months to complete and will result in advertising a repair contract to bidders. Approximately $1 million is identified to pay for the needed repairs in IDOT\u2019s most recent\u00a0multiyear program. The bridge survived a number of threats, both intentional and unintentional, including arson, erosion and high winds. It also has survived several strikes by large trucks with it&#8217;s most recent strike in 2023.  <\/span>(Scott Anderson)<br \/>Maribeth M. Wilson has been a reporter with Shaw Media for two years, one of those as news editor at the Morris Herald-News. She became a part of the NewsTribune staff in 2023. <\/p>\n<p><a href=\"https:\/\/news.google.com\/rss\/articles\/CBMivgFBVV95cUxQbjZJRU1XdW0zaE1uQWdiMEtVb3JNODdKc2plX1cyRDRmUWZDMkVmRnVWUDlRTlJESzlWRzRUelRCbVdLcVROZHhLMU5ZQ0ZRdzdFanBlZGMyZUVDZHp6NlFydVlqV1pZdXZ4SG5tTTd4Z0Y0YzVXV0RiZnNhSTRvNVEyNjR1bzFUWGhiakVZZzVGZk1OdEtjeEJNMDZnSy1CQnpxTXpFNGN3UGRZeDFBVVdJTTREc3NFZFVKclBn?oc=5\">source<\/a><\/p>\n","protected":false},"excerpt":{"rendered":"<p>An interior view of the Red Covered Bridge on Monday, June 30, 2025 in Princeton. Last Friday, the Illinois Department of Transportation announced that the historic bridge enters next rehabilitation phase. Phase II includes the preparation of a detailed cost estimate and expected to take 12 to 18 months to complete and will result in advertising a repair contract to<\/p>\n","protected":false},"author":1,"featured_media":0,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"nf_dc_page":"","om_disable_all_campaigns":false,"_monsterinsights_skip_tracking":false,"_monsterinsights_sitenote_active":false,"_monsterinsights_sitenote_note":"","_monsterinsights_sitenote_category":0,"_jetpack_newsletter_access":"","_jetpack_dont_email_post_to_subs":false,"_jetpack_newsletter_tier_id":0,"_jetpack_memberships_contains_paywalled_content":false,"_jetpack_memberships_contains_paid_content":false,"footnotes":""},"categories":[1],"tags":[],"class_list":["post-8051","post","type-post","status-publish","format-standard","hentry","category-uncategorized"],"aioseo_notices":[],"aioseo_head":"\n\t\t<!-- All in One SEO 4.9.10 - aioseo.com -->\n\t<meta name=\"description\" content=\"An interior view of the Red Covered Bridge on Monday, June 30, 2025 in Princeton. Last Friday, the Illinois Department of Transportation announced that the historic bridge enters next rehabilitation phase. Phase II includes the preparation of a detailed cost estimate and expected to take 12 to 18 months to complete and will result in\" \/>\n\t<meta name=\"robots\" content=\"max-image-preview:large\" \/>\n\t<meta name=\"author\" content=\"princetonmays\"\/>\n\t<link rel=\"canonical\" href=\"https:\/\/princetonillinois.com\/?p=8051\" \/>\n\t<meta name=\"generator\" content=\"All in One SEO (AIOSEO) 4.9.10\" \/>\n\t\t<meta property=\"og:locale\" content=\"en_US\" \/>\n\t\t<meta property=\"og:site_name\" content=\"Princeton Illinois Community - Stay Awhile\" \/>\n\t\t<meta property=\"og:type\" content=\"article\" \/>\n\t\t<meta property=\"og:title\" content=\"Princeton\u2019s historic Red Covered Bridge enters next phase of repairs \u2013 shawlocal.com - Princeton Illinois Community\" \/>\n\t\t<meta property=\"og:description\" content=\"An interior view of the Red Covered Bridge on Monday, June 30, 2025 in Princeton. Last Friday, the Illinois Department of Transportation announced that the historic bridge enters next rehabilitation phase. Phase II includes the preparation of a detailed cost estimate and expected to take 12 to 18 months to complete and will result in\" \/>\n\t\t<meta property=\"og:url\" content=\"https:\/\/princetonillinois.com\/?p=8051\" \/>\n\t\t<meta property=\"article:published_time\" content=\"2025-08-28T21:23:52+00:00\" \/>\n\t\t<meta property=\"article:modified_time\" content=\"2025-08-28T21:23:52+00:00\" \/>\n\t\t<meta name=\"twitter:card\" content=\"summary\" \/>\n\t\t<meta name=\"twitter:title\" content=\"Princeton\u2019s historic Red Covered Bridge enters next phase of repairs \u2013 shawlocal.com - Princeton Illinois Community\" \/>\n\t\t<meta name=\"twitter:description\" content=\"An interior view of the Red Covered Bridge on Monday, June 30, 2025 in Princeton. Last Friday, the Illinois Department of Transportation announced that the historic bridge enters next rehabilitation phase. Phase II includes the preparation of a detailed cost estimate and expected to take 12 to 18 months to complete and will result in\" \/>\n\t\t<script type=\"application\/ld+json\" class=\"aioseo-schema\">\n\t\t\t{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"BlogPosting\",\"@id\":\"https:\\\/\\\/princetonillinois.com\\\/?p=8051#blogposting\",\"name\":\"Princeton\\u2019s historic Red Covered Bridge enters next phase of repairs \\u2013 shawlocal.com - Princeton Illinois Community\",\"headline\":\"Princeton\\u2019s historic Red Covered Bridge enters next phase of repairs &#8211; shawlocal.com\",\"author\":{\"@id\":\"https:\\\/\\\/princetonillinois.com\\\/?author=1#author\"},\"publisher\":{\"@id\":\"https:\\\/\\\/princetonillinois.com\\\/#organization\"},\"image\":{\"@type\":\"ImageObject\",\"url\":\"https:\\\/\\\/www.shawlocal.com\\\/resizer\\\/9TZVD666HNyfOH0WxBoxnCydTBw=\\\/1200x630\\\/filters:format(jpg):quality(70)\\\/cloudfront-us-east-1.images.arcpublishing.com\\\/shawmedia\\\/3NWB77NCRVBZXMTXHEUKNFYXIE.jpg\",\"@id\":\"https:\\\/\\\/princetonillinois.com\\\/?p=8051\\\/#articleImage\"},\"datePublished\":\"2025-08-28T21:23:52+00:00\",\"dateModified\":\"2025-08-28T21:23:52+00:00\",\"inLanguage\":\"en-US\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/princetonillinois.com\\\/?p=8051#webpage\"},\"isPartOf\":{\"@id\":\"https:\\\/\\\/princetonillinois.com\\\/?p=8051#webpage\"},\"articleSection\":\"Uncategorized\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/princetonillinois.com\\\/?p=8051#breadcrumblist\",\"itemListElement\":[{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/princetonillinois.com#listItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/princetonillinois.com\",\"nextItem\":{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/princetonillinois.com\\\/?cat=1#listItem\",\"name\":\"Uncategorized\"}},{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/princetonillinois.com\\\/?cat=1#listItem\",\"position\":2,\"name\":\"Uncategorized\",\"item\":\"https:\\\/\\\/princetonillinois.com\\\/?cat=1\",\"nextItem\":{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/princetonillinois.com\\\/?p=8051#listItem\",\"name\":\"Princeton\\u2019s historic Red Covered Bridge enters next phase of repairs &#8211; shawlocal.com\"},\"previousItem\":{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/princetonillinois.com#listItem\",\"name\":\"Home\"}},{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/princetonillinois.com\\\/?p=8051#listItem\",\"position\":3,\"name\":\"Princeton\\u2019s historic Red Covered Bridge enters next phase of repairs &#8211; shawlocal.com\",\"previousItem\":{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/princetonillinois.com\\\/?cat=1#listItem\",\"name\":\"Uncategorized\"}}]},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/princetonillinois.com\\\/#organization\",\"name\":\"Princeton Illinois Community\",\"description\":\"Stay Awhile\",\"url\":\"https:\\\/\\\/princetonillinois.com\\\/\"},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/princetonillinois.com\\\/?author=1#author\",\"url\":\"https:\\\/\\\/princetonillinois.com\\\/?author=1\",\"name\":\"princetonmays\",\"image\":{\"@type\":\"ImageObject\",\"@id\":\"https:\\\/\\\/princetonillinois.com\\\/?p=8051#authorImage\",\"url\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/09e8404a609ee4949543e2641a634daaf304c5f09349f3abe2023088ea527d32?s=96&d=mm&r=g\",\"width\":96,\"height\":96,\"caption\":\"princetonmays\"}},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/princetonillinois.com\\\/?p=8051#webpage\",\"url\":\"https:\\\/\\\/princetonillinois.com\\\/?p=8051\",\"name\":\"Princeton\\u2019s historic Red Covered Bridge enters next phase of repairs \\u2013 shawlocal.com - Princeton Illinois Community\",\"description\":\"An interior view of the Red Covered Bridge on Monday, June 30, 2025 in Princeton. Last Friday, the Illinois Department of Transportation announced that the historic bridge enters next rehabilitation phase. Phase II includes the preparation of a detailed cost estimate and expected to take 12 to 18 months to complete and will result in\",\"inLanguage\":\"en-US\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/princetonillinois.com\\\/#website\"},\"breadcrumb\":{\"@id\":\"https:\\\/\\\/princetonillinois.com\\\/?p=8051#breadcrumblist\"},\"author\":{\"@id\":\"https:\\\/\\\/princetonillinois.com\\\/?author=1#author\"},\"creator\":{\"@id\":\"https:\\\/\\\/princetonillinois.com\\\/?author=1#author\"},\"datePublished\":\"2025-08-28T21:23:52+00:00\",\"dateModified\":\"2025-08-28T21:23:52+00:00\"},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/princetonillinois.com\\\/#website\",\"url\":\"https:\\\/\\\/princetonillinois.com\\\/\",\"name\":\"Princeton Illinois Community\",\"description\":\"Stay Awhile\",\"inLanguage\":\"en-US\",\"publisher\":{\"@id\":\"https:\\\/\\\/princetonillinois.com\\\/#organization\"}}]}\n\t\t<\/script>\n\t\t<!-- All in One SEO -->\n\n","aioseo_head_json":{"title":"Princeton\u2019s historic Red Covered Bridge enters next phase of repairs \u2013 shawlocal.com - Princeton Illinois Community","description":"An interior view of the Red Covered Bridge on Monday, June 30, 2025 in Princeton. Last Friday, the Illinois Department of Transportation announced that the historic bridge enters next rehabilitation phase. Phase II includes the preparation of a detailed cost estimate and expected to take 12 to 18 months to complete and will result in","canonical_url":"https:\/\/princetonillinois.com\/?p=8051","robots":"max-image-preview:large","keywords":"","webmasterTools":{"miscellaneous":""},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"BlogPosting","@id":"https:\/\/princetonillinois.com\/?p=8051#blogposting","name":"Princeton\u2019s historic Red Covered Bridge enters next phase of repairs \u2013 shawlocal.com - Princeton Illinois Community","headline":"Princeton\u2019s historic Red Covered Bridge enters next phase of repairs &#8211; shawlocal.com","author":{"@id":"https:\/\/princetonillinois.com\/?author=1#author"},"publisher":{"@id":"https:\/\/princetonillinois.com\/#organization"},"image":{"@type":"ImageObject","url":"https:\/\/www.shawlocal.com\/resizer\/9TZVD666HNyfOH0WxBoxnCydTBw=\/1200x630\/filters:format(jpg):quality(70)\/cloudfront-us-east-1.images.arcpublishing.com\/shawmedia\/3NWB77NCRVBZXMTXHEUKNFYXIE.jpg","@id":"https:\/\/princetonillinois.com\/?p=8051\/#articleImage"},"datePublished":"2025-08-28T21:23:52+00:00","dateModified":"2025-08-28T21:23:52+00:00","inLanguage":"en-US","mainEntityOfPage":{"@id":"https:\/\/princetonillinois.com\/?p=8051#webpage"},"isPartOf":{"@id":"https:\/\/princetonillinois.com\/?p=8051#webpage"},"articleSection":"Uncategorized"},{"@type":"BreadcrumbList","@id":"https:\/\/princetonillinois.com\/?p=8051#breadcrumblist","itemListElement":[{"@type":"ListItem","@id":"https:\/\/princetonillinois.com#listItem","position":1,"name":"Home","item":"https:\/\/princetonillinois.com","nextItem":{"@type":"ListItem","@id":"https:\/\/princetonillinois.com\/?cat=1#listItem","name":"Uncategorized"}},{"@type":"ListItem","@id":"https:\/\/princetonillinois.com\/?cat=1#listItem","position":2,"name":"Uncategorized","item":"https:\/\/princetonillinois.com\/?cat=1","nextItem":{"@type":"ListItem","@id":"https:\/\/princetonillinois.com\/?p=8051#listItem","name":"Princeton\u2019s historic Red Covered Bridge enters next phase of repairs &#8211; shawlocal.com"},"previousItem":{"@type":"ListItem","@id":"https:\/\/princetonillinois.com#listItem","name":"Home"}},{"@type":"ListItem","@id":"https:\/\/princetonillinois.com\/?p=8051#listItem","position":3,"name":"Princeton\u2019s historic Red Covered Bridge enters next phase of repairs &#8211; shawlocal.com","previousItem":{"@type":"ListItem","@id":"https:\/\/princetonillinois.com\/?cat=1#listItem","name":"Uncategorized"}}]},{"@type":"Organization","@id":"https:\/\/princetonillinois.com\/#organization","name":"Princeton Illinois Community","description":"Stay Awhile","url":"https:\/\/princetonillinois.com\/"},{"@type":"Person","@id":"https:\/\/princetonillinois.com\/?author=1#author","url":"https:\/\/princetonillinois.com\/?author=1","name":"princetonmays","image":{"@type":"ImageObject","@id":"https:\/\/princetonillinois.com\/?p=8051#authorImage","url":"https:\/\/secure.gravatar.com\/avatar\/09e8404a609ee4949543e2641a634daaf304c5f09349f3abe2023088ea527d32?s=96&d=mm&r=g","width":96,"height":96,"caption":"princetonmays"}},{"@type":"WebPage","@id":"https:\/\/princetonillinois.com\/?p=8051#webpage","url":"https:\/\/princetonillinois.com\/?p=8051","name":"Princeton\u2019s historic Red Covered Bridge enters next phase of repairs \u2013 shawlocal.com - Princeton Illinois Community","description":"An interior view of the Red Covered Bridge on Monday, June 30, 2025 in Princeton. Last Friday, the Illinois Department of Transportation announced that the historic bridge enters next rehabilitation phase. Phase II includes the preparation of a detailed cost estimate and expected to take 12 to 18 months to complete and will result in","inLanguage":"en-US","isPartOf":{"@id":"https:\/\/princetonillinois.com\/#website"},"breadcrumb":{"@id":"https:\/\/princetonillinois.com\/?p=8051#breadcrumblist"},"author":{"@id":"https:\/\/princetonillinois.com\/?author=1#author"},"creator":{"@id":"https:\/\/princetonillinois.com\/?author=1#author"},"datePublished":"2025-08-28T21:23:52+00:00","dateModified":"2025-08-28T21:23:52+00:00"},{"@type":"WebSite","@id":"https:\/\/princetonillinois.com\/#website","url":"https:\/\/princetonillinois.com\/","name":"Princeton Illinois Community","description":"Stay Awhile","inLanguage":"en-US","publisher":{"@id":"https:\/\/princetonillinois.com\/#organization"}}]},"og:locale":"en_US","og:site_name":"Princeton Illinois Community - Stay Awhile","og:type":"article","og:title":"Princeton\u2019s historic Red Covered Bridge enters next phase of repairs \u2013 shawlocal.com - Princeton Illinois Community","og:description":"An interior view of the Red Covered Bridge on Monday, June 30, 2025 in Princeton. Last Friday, the Illinois Department of Transportation announced that the historic bridge enters next rehabilitation phase. Phase II includes the preparation of a detailed cost estimate and expected to take 12 to 18 months to complete and will result in","og:url":"https:\/\/princetonillinois.com\/?p=8051","article:published_time":"2025-08-28T21:23:52+00:00","article:modified_time":"2025-08-28T21:23:52+00:00","twitter:card":"summary","twitter:title":"Princeton\u2019s historic Red Covered Bridge enters next phase of repairs \u2013 shawlocal.com - Princeton Illinois Community","twitter:description":"An interior view of the Red Covered Bridge on Monday, June 30, 2025 in Princeton. Last Friday, the Illinois Department of Transportation announced that the historic bridge enters next rehabilitation phase. Phase II includes the preparation of a detailed cost estimate and expected to take 12 to 18 months to complete and will result in"},"aioseo_meta_data":{"post_id":"8051","title":null,"description":null,"keywords":null,"keyphrases":null,"primary_term":null,"canonical_url":null,"og_title":null,"og_description":null,"og_object_type":"default","og_image_type":"default","og_image_url":null,"og_image_width":null,"og_image_height":null,"og_image_custom_url":null,"og_image_custom_fields":null,"og_video":null,"og_custom_url":null,"og_article_section":null,"og_article_tags":null,"twitter_use_og":false,"twitter_card":"default","twitter_image_type":"default","twitter_image_url":null,"twitter_image_custom_url":null,"twitter_image_custom_fields":null,"twitter_title":null,"twitter_description":null,"schema":{"blockGraphs":[],"customGraphs":[],"default":{"data":{"Article":[],"Course":[],"Dataset":[],"FAQPage":[],"Movie":[],"Person":[],"Product":[],"ProductReview":[],"Car":[],"Recipe":[],"Service":[],"SoftwareApplication":[],"WebPage":[]},"graphName":"","isEnabled":true},"graphs":[]},"schema_type":"default","schema_type_options":null,"pillar_content":false,"robots_default":true,"robots_noindex":false,"robots_noarchive":false,"robots_nosnippet":false,"robots_nofollow":false,"robots_noimageindex":false,"robots_noodp":false,"robots_notranslate":false,"robots_max_snippet":null,"robots_max_videopreview":null,"robots_max_imagepreview":"large","priority":null,"frequency":null,"local_seo":null,"breadcrumb_settings":null,"limit_modified_date":false,"ai":null,"created":"2025-08-28 21:26:37","updated":"2025-08-28 21:26:37","seo_analyzer_scan_date":null},"aioseo_breadcrumb":"<div class=\"aioseo-breadcrumbs\"><span class=\"aioseo-breadcrumb\">\n\t\t\t<a href=\"https:\/\/princetonillinois.com\" title=\"Home\">Home<\/a>\n\t\t<\/span><span class=\"aioseo-breadcrumb-separator\">&raquo;<\/span><span class=\"aioseo-breadcrumb\">\n\t\t\t<a href=\"https:\/\/princetonillinois.com\/?cat=1\" title=\"Uncategorized\">Uncategorized<\/a>\n\t\t<\/span><span class=\"aioseo-breadcrumb-separator\">&raquo;<\/span><span class=\"aioseo-breadcrumb\">\n\t\t\tPrinceton\u2019s historic Red Covered Bridge enters next phase of repairs \u2013 shawlocal.com\n\t\t<\/span><\/div>","aioseo_breadcrumb_json":[{"label":"Home","link":"https:\/\/princetonillinois.com"},{"label":"Uncategorized","link":"https:\/\/princetonillinois.com\/?cat=1"},{"label":"Princeton\u2019s historic Red Covered Bridge enters next phase of repairs &#8211; shawlocal.com","link":"https:\/\/princetonillinois.com\/?p=8051"}],"jetpack_featured_media_url":"","jetpack-related-posts":[],"jetpack_sharing_enabled":true,"_links":{"self":[{"href":"https:\/\/princetonillinois.com\/index.php?rest_route=\/wp\/v2\/posts\/8051","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/princetonillinois.com\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/princetonillinois.com\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/princetonillinois.com\/index.php?rest_route=\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/princetonillinois.com\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=8051"}],"version-history":[{"count":0,"href":"https:\/\/princetonillinois.com\/index.php?rest_route=\/wp\/v2\/posts\/8051\/revisions"}],"wp:attachment":[{"href":"https:\/\/princetonillinois.com\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=8051"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/princetonillinois.com\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=8051"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/princetonillinois.com\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=8051"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}